5
Door sets overhauled
2
Separate phases of work
1
Emergency double-door repair
Live
School in session
Client
Towers School & Sixth Form Centre
Sector
Education
Location
Ashford, Kent
Status
Completed
01 — The Brief
The school asked us to overhaul doors around the site, then called us back when a double door failed.
02 — The Challenge
Doors were spread across several buildings with mixed hardware ages, and the emergency double door needed making safe and secure the same visit.
03 — Our Response
Phase one: five door sets overhauled with faulty parts replaced, adjusted and realigned. Phase two: emergency repair of the double door's pivots, arms and maglock alignment.
04 — The Outcome
Doors across the site now open, close and lock reliably, and the school has a single contractor for planned and reactive door work.
Site photography
Education / SENKent
New overhead closers, bottom pivot and top arms
View case study
Education / SENLondon
Restricted hinge sets replaced across two classrooms
View case study
Offices / FMArthur Street, City of London
Both floor springs replaced and maglock aligned
View case study