Education — Case Study

    Towers School & Sixth Form Centre — Five Door Sets Overhauled, Plus Emergency Repairs

    Two phases of work: a planned overhaul of five aluminium door sets, followed by an emergency repair to a double door's pivots, arms and maglock.

    5

    Door sets overhauled

    2

    Separate phases of work

    1

    Emergency double-door repair

    Live

    School in session

    Client

    Towers School & Sixth Form Centre

    Sector

    Education

    Location

    Ashford, Kent

    Status

    Completed

    01 — The Brief

    The school asked us to overhaul doors around the site, then called us back when a double door failed.

    02 — The Challenge

    Doors were spread across several buildings with mixed hardware ages, and the emergency double door needed making safe and secure the same visit.

    03 — Our Response

    Phase one: five door sets overhauled with faulty parts replaced, adjusted and realigned. Phase two: emergency repair of the double door's pivots, arms and maglock alignment.

    04 — The Outcome

    Doors across the site now open, close and lock reliably, and the school has a single contractor for planned and reactive door work.

    Site photography

    Project Photo Record

    55 genuine site photos — click any to enlarge

    Need similar work on your estate?

    Talk to our team about reactive repairs, planned maintenance or replacement for your buildings.