Offices / FM — Case Study

    Broadridge Financial Solutions — Double Glass Entrance Floor Springs Replaced

    A pair of frameless glass office doors were taken down, both floor springs replaced, then reinstalled with the maglock realigned and tested.

    2

    Floor springs replaced

    2

    Glass leaves removed and refitted

    1

    Maglock realigned

    City

    Occupied office floor

    Client

    Broadridge Financial Solutions

    Sector

    Offices / FM

    Location

    Arthur Street, City of London

    Status

    Completed

    01 — The Brief

    A double glass entrance in a City office was failing to close and hold, affecting security on the floor.

    02 — The Challenge

    Heavy glass leaves had to be lifted off floor springs in an occupied office, with a safe work zone and no damage to finishes.

    03 — Our Response

    We set up a barriered zone, removed both glass leaves, replaced the two floor springs, reinstalled the doors and aligned the maglock.

    04 — The Outcome

    Both leaves now close and hold correctly and the maglock engages first time.

    Site photography

    Project Photo Record

    11 genuine site photos — click any to enlarge

    On-Site Video

    Need similar work on your estate?

    Talk to our team about reactive repairs, planned maintenance or replacement for your buildings.