Roomzzz Stratford
Sector
Hotels / Hospitality
Location
Stratford, East London
Status
Completed
01 — The Brief
A door at the aparthotel was failing to close and had damaged hardware.
02 — The Challenge
Guests were on site throughout, so the work had to be quick and tidy.
03 — Our Response
We removed the defective limit switch, replaced the bottom pivot and overhead transom closer, realigned and tested.
04 — The Outcome
The door closes smoothly and reliably.