Skyjack SJ45 boom MEWP carrying out second floor glass replacement at WTW Westgate, Redhill
    Commercial Office / FM Project

    WTW Redhill — High-Level Glazed Unit Replacement

    Appointed to replace a cracked second floor glazed unit at WTW Westgate in Redhill — Skyjack SJ45 boom MEWP access, controlled glass removal, replacement sealed unit, sealing, local making good and coordination with the WTW site management team.

    Client

    WTW

    Sector

    Commercial Offices / Facilities Management

    Location

    Westgate, 120-130 Station Road, Redhill, Surrey, RH1 1WS

    Project Type

    Second floor sealed glazed unit replacement (MEWP)

    01

    Overview

    NZR was appointed to replace a cracked second floor glazed unit at WTW Westgate in Redhill. The project required high-level access using a Skyjack SJ45 boom MEWP, controlled glass removal, installation of a replacement sealed glazed unit, sealing, local making good, waste removal and coordination with the WTW site management team.

    02

    The Challenge

    The damaged unit was located on the second floor of an occupied commercial office building. The works required safe MEWP access from the car park, controlled exclusion zones, careful glass handling, clear communication with site management and minimal disruption to staff, visitors and building operations.

    03

    Scope of Works

    • Site coordination with WTW management
    • Site-specific RAMS
    • MEWP provision for second floor access
    • Set-up of controlled exclusion zone
    • Use of Skyjack SJ45 boom MEWP
    • Removal of existing cracked glazed unit
    • Safe handling and controlled removal of damaged glass
    • Supply and installation of replacement sealed glazed unit
    • Correct packing, alignment, re-beading and re-gasketing
    • Sealing and local making good
    • Waste glass and packaging removal
    • Final checks and handover
    04

    Our Approach

    NZR planned the works around the live office environment and car park access requirements. The team reviewed the RAMS, set up an exclusion zone, positioned the MEWP safely and accessed the second floor window externally. The cracked glazed unit was removed using controlled glazing methods before the replacement sealed unit was installed, packed, aligned, re-beaded, sealed and checked.

    05

    Outcome

    The cracked second floor glazed unit was replaced safely and professionally using controlled MEWP access. The works were completed with site coordination, RAMS, access control, sealing, local making good, waste removal and handover to site management.

    High-level second floor glazed unit replaced safely under a controlled MEWP methodology — RAMS, exclusion zone, safe glass handling, sealing, making good and handover to site management.
    WTW Westgate, Redhill — Project Summary
    Project Gallery

    Site set-up, high-level works and finished unit

    A focused selection of project photography — site set-up and access control, the high-level glazing works themselves, and the finished replacement unit.

    Site Set-up

    MEWP positioning, access control and exclusion zone

    4 items

    NZR van and Skyjack SJ45 boom MEWP set up in the car park with controlled exclusion zone and no-access barriers beneath the works area.

    Cracked second floor sealed glazed unit at WTW Westgate, Redhill prior to replacement
    Before — cracked second floor sealed glazed unit identified for replacement
    Skyjack SJ45 boom MEWP delivered on a flatbed lorry outside WTW Westgate, Redhill
    MEWP delivery — Skyjack SJ45 boom arriving on site at WTW Westgate
    NZR Windows & Doors van and Skyjack boom MEWP set up in the car park at WTW Westgate, Redhill
    Site set-up — NZR van, MEWP positioned and exclusion zone established in the car park
    Access control and exclusion zone barriers in place beneath the works area at WTW Redhill
    Access control — no-access barriers beneath the works area
    During

    High-level glazing works — second floor

    5 items

    Skyjack SJ45 boom MEWP positioned against the second floor, with controlled removal of the cracked unit and installation of the replacement sealed glazed unit.

    Skyjack SJ45 boom MEWP positioned against the second floor of WTW Westgate for high-level glazing works
    Skyjack SJ45 boom MEWP positioned at the second floor for high-level glazing works
    NZR operative at second floor level in the MEWP basket carrying out glazed unit replacement at WTW Redhill
    High-level glazing installation — operative working from the MEWP basket
    NZR operatives in hi-vis fitting the replacement sealed glazed unit at WTW Westgate, Redhill
    Two-man fit — NZR operatives installing the replacement sealed glazed unit
    Close-up of second floor glazed unit replacement works at WTW Westgate, Redhill
    Close-up of the second floor glazed unit replacement
    MEWP high-level glazing works — site footage
    After

    Finished replacement sealed glazed unit

    2 items

    External and internal views of the completed second floor sealed glazed unit replacement.

    External view of the finished replacement sealed glazed unit at WTW Westgate, Redhill
    External — finished replacement sealed glazed unit
    Internal view from inside the WTW office of the finished replacement glazed unit
    Internal — finished glazed unit from inside the office

    Next Step

    Need high-level commercial glazing support?

    Send over your repair, access, survey or replacement requirement and our team will advise the next step.

    Coverage

    Areas we cover

    London

    • Central London
    • East London
    • South London
    • North London
    • West London

    Surrey

    • Redhill
    • Reigate
    • Croydon
    • Kingston
    • Guildford
    • Epsom
    • Woking

    Kent

    • Dartford
    • Gravesend
    • Maidstone
    • Sevenoaks
    • Bromley
    • Swanley

    Essex

    • Romford
    • Ilford
    • Chelmsford
    • Brentwood
    • Basildon