Completed floor-to-ceiling aluminium glazing at Dover Innovation Centre
    Commercial Office Project

    Dover Innovation Centre — Wall Cut-Out & Floor-to-Ceiling Glazing

    Structural wall modifications and large-format aluminium window installation to transform a multi-tenanted office building with abundant natural light.

    Client

    Multi-Tenant Commercial Office

    Sector

    Commercial / Office

    Location

    Dover, Kent

    Project Type

    Wall Cut-Out & Window Enlargement

    01

    Overview

    NZR delivered a comprehensive glazing transformation at the Dover Innovation Centre, a multi-tenanted commercial office building in Kent. The project involved cutting out sections of the external walls to create larger window apertures, replacing outdated rounded windows with modern floor-to-ceiling aluminium glazing.

    02

    The Challenge

    The original windows were small, dated and restricted daylight into the workspaces. Enlarging them required structural wall cut-outs, temporary propping and careful coordination around tenants who needed to keep working throughout the programme.

    03

    Scope of Works

    • Structural wall cut-outs to enlarge window apertures
    • Removal of outdated rounded windows
    • Supply and installation of aluminium window systems
    • Floor-to-ceiling glazing in multiple offices
    • Double glazed sealed units with improved U-values
    • High-level external access with scissor lifts
    • Internal plastering and making good
    • Full weatherproofing and sealing
    04

    Our Approach

    Works were sequenced office by office to keep the building operational. External access was via scissor lift, with structural cut-outs formed, new aluminium frames installed and double glazed sealed units fitted. Internal plastering, trim and making good completed each room before moving on.

    05

    Outcome

    The transformed offices now benefit from floor-to-ceiling daylight, slim aluminium sightlines and noticeably better thermal performance — delivered in a three-week programme with minimal tenant disruption.

    Wall cut-outs, floor-to-ceiling aluminium glazing and full internal make-good delivered across 12+ windows while keeping a multi-tenant office fully operational.
    NZR — Dover Innovation Centre Project Summary
    Project Gallery

    Full site photography — every phase of the works

    Before, during and after photography of the structural wall cut-outs and floor-to-ceiling aluminium glazing installation at Dover Innovation Centre.

    Before

    Original windows

    2 items

    The existing rounded windows were outdated, restrictive and limited natural light into the offices.

    Original rounded windows at Dover Innovation Centre before replacement
    Original outdated rounded windows restricting natural light
    Existing small window apertures at Dover Innovation Centre
    Existing window apertures limiting daylight in office spaces
    During

    Cut-outs, framing, glazing and making good

    11 items

    Structural wall sections removed to create larger apertures, followed by aluminium frame installation, glazing and full internal make-good.

    Wall section removed to create larger window opening
    Wall cut-out: structural section removed to accommodate larger glazing
    Preparing office space for new glazing installation
    Workspace preparation and protective measures in place
    Structural preparation for aluminium window frames
    Structural opening prepared with steel supports
    Aluminium window frames being installed
    New aluminium frames positioned in enlarged apertures
    Commercial double glazing units being fitted
    Double glazed sealed units being installed
    Window fitting in progress at commercial office
    Precision fitting and alignment of window units
    NZR team installing large format commercial windows
    Floor-to-ceiling aluminium system being installed
    High-level access with scissor lift for commercial glazing
    Scissor lift access for external works and sealing
    Making good after window installation
    Making good around new frames
    Weather sealing commercial aluminium windows
    Perimeter sealing for weather tightness
    Interior finishing works after window replacement
    Interior finishing and trim installation
    After

    Completed offices

    5 items

    Floor-to-ceiling glazing now floods the workspaces with natural light, with improved thermal performance and slim aluminium sightlines.

    Completed large format windows flooding office with light
    Transformed office space with floor-to-ceiling glazing
    New aluminium windows overlooking woodland
    Slim aluminium frames maximising glass area and views
    Modern office workspace with new commercial windows
    Bright, modern workspace with improved thermal performance
    Industrial-style aluminium windows in refurbished office
    Industrial aesthetic with HVAC integration maintained
    Completed commercial glazing project at Dover Innovation Centre
    Project complete — a brighter, more productive workspace

    Next Step

    Planning a similar wall cut-out or large-format aluminium glazing project?

    Like Dover Innovation Centre, we deliver structural wall modifications, oversized aluminium window installations and full internal make-good across multi-tenanted office buildings — coordinated to keep your building operational throughout.

    Coverage

    Areas we cover

    London

    • Central London
    • East London
    • South London
    • North London
    • West London

    Kent

    • Dartford
    • Gravesend
    • Maidstone
    • Sevenoaks
    • Bromley
    • Swanley

    Essex

    • Romford
    • Ilford
    • Chelmsford
    • Brentwood
    • Basildon

    Surrey

    • Croydon
    • Kingston
    • Guildford
    • Epsom
    • Woking